Construction of single-family, two-unit houses in Gliwice-Żerniki.
START OF CONSTRUCTION: 05-06 / 2019
END OF CONSTRUCTION: 05-06 / 2020
4 houses built in traditional brick technology in a closed shell (windows, roof, facade).
The buildings are located in one of the most attractive districts of Gliwice-Żerniki, close to the city center, but at the same time away from the hustle and bustle of the city, in a picturesque setting, full of greenery. The access road is paved.
Very quick access to the center of Gliwice, DK 88, A4, and A1 roads.
Houses with a usable area of 103.48 m2. The above buildings have a very favorable and functional layout of rooms and an optimal location in relation to the directions of the world in terms of maximizing natural light usage in the interiors and thermic efficiency.
GROUND FLOOR: vestibule, corridor, kitchen with dining room, living room, bathroom, technical room / laundry room.
FLOOR: corridor, 3 bedrooms, bathroom.
UNUSED ATTIC: 18m2 to be adapted
The offer includes 4 semi-detached segments. 345m2 plots (rectangular plot shape)
Construction and materials:
- buildings without a basement, set on a foundation slab
- monolithic reinforced concrete ceiling
- gable roof, symmetrical, slope of 45 degrees, truss in a wooden structure, finished with ceramic tiles
- walls in traditional technology, made of POROTHERM ceramic brick, insulated with 20 cm polystyrene, finished with mineral plaster
- two full-height storeys
- PVC window joinery, triple-pane windows, HS PANORAMA window in the living room
gas heating
Connection of external installations, electricity, gas, water and sanitary installations - included in the price of the house.
SALES FINISHED