Construction of semi-detached and terraced houses in Świętoszowice, Zbrosławice commune.

 

CONSTRUCTION COMPLETION spring 2019

 

Completed construction of seven houses in traditional brick technology with a classic shape and modern details. The buildings are located in a picturesque, green area. Very easy and quick access to Gliwice, Zabrze (approx. 10 minutes), 2 minutes to the A1 motorway junction.

Houses with an area 127 m2 situated on plots with an area ranging from 213 m2 to 465 m2. They have a very favorable arrangement of rooms in terms of sunlight.

 

GROUND FLOOR: vestibule, kitchen, living room with dining area, hall, toilet, boiler room, garage, pantry.

FIRST FLOOR: hall, 3 rooms, dressing room, bathroom, laundry room.

 

Construction and materials:

walls: ceramic block 25 cm, polystyrene 20 cm, mineral plaster,

ceiling: reinforced concrete slab,

knee wall: 138 cm,

roof: gable, slope 40 degrees, wooden truss covered with tiles,

window joinery: PVC, triple-glazed windows

heating: solid fuel or gas.

 

 

SALES FINISHED